project planning is part of project management, which is relates to the use of schedules such as gantt charts to plan and subsequently report progress within the project environment. initially, the project scope is defined and the appropriate methods for completing the project are determined. in this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
a novel acrylic acid-functionalized fe3o4 magnetic nanoparticle with a core-shell structure was developed for utilization as a heterogeneous organosuperacid in chemical transformations. the structural, surface, and magnetic characteristics of the nanosized catalyst were investigated by various techniques such as transmission electron microscopy (tem), thermogravimetric analysis (tga), and ft-ir...
In the present paper, Characteristics of fuzzy project network using statistical data are discussed in detail in order to calculate the fuzzy critical path, fuzzy earliest times, fuzzy latest times and fuzzy total float. Fuzzy number as fuzzy activity time is constructed using interval estimate by calculating mean, variance and standard error. A new ranking function is used to discriminate the ...
In this paper, we propose a new approach to critical path analysis in a project network whose activity times are uncertain. The uncertain parameters in the project network are represented by fuzzy numbers. We use fuzzy arithmetic and a fuzzy ranking method to determine the fuzzy critical path of the project network without converting the fuzzy activity times to classical numbers. The proposed m...
in order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. in this paper we consider three types of imp...
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
Critical Path method (CPM) is widely used in project scheduling and controlling. In conventional project scheduling problem, the crisp numbers are used for the activity times. But in reality, in an imprecise and uncertain environment, it is an unrealistic assumption. To represent the uncertainty involved we have considered the interval-valued numbers to represent the activity times. In this pap...
In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of i...
In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید